What Should I Know About Erecting
the Basement or Crawl Space?

While the modular home is being built at the factory, there are many final preparations that are being made to the lot.  These include pouring the footers and then constructing crawl space or the walls and floor for a basement (depending on which you want).  The walls can be made of either poured concrete or with cinder blocks.  After the concrete is hardened, a knee wall is built along the top.  This is what the house will sit on once it is lifted onto its foundation.  For houses that will have a basement, the floor is usually poured after the house is delivered.